Markham District Energy Centre Project

Equipment Handling & Installation
Our team is responsible for the careful handling, placement, and installation of key
mechanical systems that power the facility:
Chiller Installation:
Installation of a 2,800-ton chiller (B/CH-4), including detailed piping, insulation, and system integration to support optimal performance.
Pump Systems:
Installation and alignment of the Chilled Water Pump (B/P-4A) and Condenser Water Pump (B/P-4B), ensuring seamless operation and long-term reliability.
Cooling Towers:
Precision installation of 3,000-ton cooling towers (B/CT-107, 108, and 109),
complete with structural support, mechanical connections, and system integration.
5 kV Switchgear Integration:
Coordinated installation and connection of switchgear sections into the existing electrical infrastructure for a safe and reliable power interface.
Electrical Coordination
We work closely alongside electrical teams to support the installation and connection of all
components related to the chiller, pumps, cooling towers, and switchgear. This coordination helps maintain system efficiency, performance, and safety across the facility.

Testing & Commissioning
Before handover, every system undergoes thorough testing and evaluation:
• Detailed operational checks
• Performance verification
• Structured commissioning and start-up procedures. This ensures all equipment operates according to project specifications and meets the expected performance standards.