top of page

H&W Vendome – Energy Transfer Station (Ets) Construction

Project Scope

The project included the supply, installation, and integration of key ETS components
designed to support multiple operational demands:

✔ One hot water heat exchanger for space heating

✔ One hot water heat exchanger for domestic hot water

✔ One hot water heat exchanger for glycol systems

✔ One chilled water heat exchanger for space cooling

Testing & Commissioning

All installed piping systems underwent pressure testing, cleaning, and flushing to verify system integrity, performance, and compliance with project standards. These procedures ensured the ETS was fully prepared for safe and efficient operation.

IMG_3399.jpg

Project Outcome

This project delivered a fully operational Energy Transfer Station built with precision and attention to detail. The completed system supports reliable energy distribution for heating, cooling, and domestic hot water, contributing to the overall efficiency and long-term
performance of the H&W Vendome development.

bottom of page