This project delivered a fully integrated boiler and chiller plant designed for reliable, high-efficiency performance. From equipment installation and live system tie-ins to electrical, controls, and differential pressure management, every component was engineered for stability and long-term maintainability. Comprehensive testing, commissioning, and documentation ensured code compliance, operational readiness, and a smooth, fully documented turnover.
Distribution & Tie-Ins
Electrical & Controls
Testing & Turnover
We completed heating and chilled-water tie-ins to the building loop using planned live work where feasible, with engineered supports, guides/anchors, and insulation restoration for a clean, maintainable finish.
We provided switchgear/MCC connections, protection and interlocks, organized cable routing, labeled terminations, and a local control panel/HMI for alarms, statuses, and setpoints—no BAS required.
We performed flushing, water treatment, pressure and leak testing, functional performance tests, and start-up, followed by a full QA/QC package with test records, photos, redlined as-builts, O&M manuals, and training.

Project Impact
WellFab delivered a turnkey boiler and chiller plant build-out at 252 Sackville, from rigging and placement to piping, power, controls, and commissioning. The result is a reliable, efficient central plant with clean tie-ins and minimal disruption to building operations.