Our Projects

Home / Projects

Screenshot 2025-11-10 141251_edited.jpg
14" Hot tap

Delivering a live 14″ hot tap on a glycol storage tank, WellFab created a new, code-compliant nozzle without draining or contaminating product.

IMG-20251120-WA0004.avif
12" & 8" Line Stop

During a routine pump service, the client discovered that key shutoff valves had failed—putting the entire heating-glycol loop at risk.

Leak Detection Downtown

The adapted detection method enabled rapid pinpointing of riser leaks, reducing troubleshooting time within the towers.

6" Line Stop

During a routine pump service, the client discovered that key shutoff valves had failed—putting the entire heating-glycol loop at risk.

252-Sackville-scaled.jpg
252 Sackville

WellFab delivered a turnkey boiler and chiller plant build-out at 252 Sackville, from rigging and placement to piping, power, controls, and commissioning.

bf15f28a64497efe12784e3d43a09e35_-ontario-regional-municipality-of-durham-oshawa-taunton-d
Delpark homes

WellFab is proud to serve as the general contractor for the installation of a state-of-the-art 600KW Combined Heat and Power (CHP) unit at Delpark Homes in Oshawa.