Our Projects
Home / Projects

14" Hot tap
Delivering a live 14″ hot tap on a glycol storage tank, WellFab created a new, code-compliant nozzle without draining or contaminating product.

12" & 8" Line Stop
During a routine pump service, the client discovered that key shutoff valves had failed—putting the entire heating-glycol loop at risk.

Leak Detection Downtown
The adapted detection method enabled rapid pinpointing of riser leaks, reducing troubleshooting time within the towers.

6" Line Stop
During a routine pump service, the client discovered that key shutoff valves had failed—putting the entire heating-glycol loop at risk.

252 Sackville
WellFab delivered a turnkey boiler and chiller plant build-out at 252 Sackville, from rigging and placement to piping, power, controls, and commissioning.

Delpark homes
WellFab is proud to serve as the general contractor for the installation of a state-of-the-art 600KW Combined Heat and Power (CHP) unit at Delpark Homes in Oshawa.