Markham District Energy

Equipment Handling & Installation

Our team is responsible for the careful handling, placement, and installation of key
mechanical systems that power the facility:

Chiller Installation:
Installation of a 2,800-ton chiller (B/CH-4), including detailed piping, insulation, and system integration to support optimal performance.

Pump Systems:
Installation and alignment of the Chilled Water Pump (B/P-4A) and Condenser Water Pump (B/P-4B), ensuring seamless operation and long-term reliability.

Cooling Towers:
Precision installation of 3,000-ton cooling towers (B/CT-107, 108, and 109),
complete with structural support, mechanical connections, and system integration.

5 kV Switchgear Integration:
Coordinated installation and connection of switchgear sections into the existing electrical infrastructure for a safe and reliable power interface.

IMG_1102.jpg

Piping Installation

Our scope includes the installation of all related piping systems, supported by:
• Pressure testing
• System flushing and cleaning
• Quality checks to ensure operational readiness
This process ensures every line is prepared for safe, efficient performance from day one.

IMG_3399.jpg

Testing & Commissioning

Before handover, every system undergoes thorough testing and evaluation:
• Detailed operational checks
• Performance verification
• Structured commissioning and start-up procedures. This ensures all equipment operates according to project specifications and meets the expected performance standards.