top of page

BLOCK 1 – DANIELS ON PARLIAMENT

Project Scope Highlights

The Energy Transfer Station is designed to support the building’s heating, cooling, and domestic hot water demands through a reliable and efficient mechanical system.

✔ Complete supply of labour, materials, tools, equipment, and supervision required for the ETS installation

✔ Installation carried out in accordance with the latest project drawings, specifications, addenda, and site instructions

✔ Mechanical piping and equipment installation completed to meet Ontario Building Code, National Building Code, City of Toronto requirements, CSA standards, and all applicable authorities

✔ Coordinated execution to support project schedule, site safety, and quality expectations

IMG_1102.jpg

Testing & Commissioning

All piping systems are completed with proper pressure testing, system cleaning, flushing, and quality checks to ensure reliable performance and compliance with project requirements. Each stage of installation is reviewed carefully to meet project specifications, industry standards, and WellFab’s internal quality expectations.

IMG_3399.jpg

Project Impact

This ETS installation plays an important role in supporting the mechanical infrastructure of Daniels on Parliament Block 1. Located in the heart of downtown Toronto, the project reflects WellFab’s commitment to delivering high-quality energy systems for major residential and mixed-use developments.

Through strong coordination, skilled workmanship, and attention to detail, WellFab continues to provide dependable mechanical solutions built for performance, durability, and long-term building operation.

bottom of page