top of page

6″ PVC HOT TAP

Project Overview

This project involved adding a new 6″ branch connection to an existing PVC pipeline using a controlled hot tapping process. WellFab planned the work around material compatibility, connection alignment, sealing integrity, cutting control, and clean restoration of the new tie-in point.

The completed hot tap provided a reliable new connection while maintaining the integrity of the existing PVC piping system.

IMG_1102.jpg

​

​

Technical Execution

✓ 6″ hot tap completed on an existing PVC pipeline

✓ Branch connection prepared and aligned before cutting

✓ Hot tapping approach coordinated for the PVC piping material

✓ Cutting operation completed under controlled conditions

✓ Coupon managed during the tapping process

✓ Connection sealing and integrity verified after completion

✓ New tie-in point restored for service

IMG_3399.jpg

Project Impact

The completed 6″ hot tap added a new branch connection without requiring major modification of the existing PVC piping network. Careful control of alignment, cutting, sealing, and restoration helped preserve the integrity of the existing system.

The project adds another material-specific example to WellFab’s hot tapping portfolio and demonstrates the importance of adapting the field approach to the piping system being modified.

Need Hot Tapping Support for a Live System?

Explore WellFab’s hot tapping capabilities, equipment, operating ranges, and live connection services.

bottom of page