2 × 8″ HOT TAPS - Chiller Underground Water Line
Project Overview
This project involved two 8″ live hot taps on an active underground chiller water line. WellFab installed the required branch fittings and isolation valves, performed controlled live cutting, verified coupon capture, monitored pressure integrity, and restored the connection points after completion.
The completed connections provided added system flexibility while allowing the chiller water system to remain operational throughout the work.

Scope of Work
✓ Completed two 8″ live hot taps on the active underground chiller water line while maintaining continuous system operation.
✓ Installed engineered branch fittings and isolation valves to create secure, serviceable connection points.
✓ Performed controlled cutting under pressure using specialized hot tapping equipment and a carefully planned procedure.
✓ Captured and verified both pipe coupons to confirm clean, complete cuts and prevent loose material from entering the system.
✓ Restored and secured all connection points following completion of the hot tapping work.

Projects Impact
Careful planning and execution allowed the work to be completed safely within a confined underground environment while maintaining system operation.
The completed connections improved system flexibility, supported reliable long-term chiller performance, and demonstrated WellFab’s ability to perform large-diameter live connections on active underground mechanical infrastructure.