top of page

10″ HOT TAP – TONISCO VALVE SOLUTION

Project Overview

This project involved a 10″ live hot tap on an active pipeline using a Tonisco hot tapping valve system. WellFab planned and executed the connection to establish a new branch point while maintaining the pipeline in service.

The work sequence included valve installation, equipment positioning and alignment, controlled live cutting, coupon recovery, pressure monitoring, and final verification of the completed connection.

IMG_1102.jpg

​

​

Technical Execution

✓ 10″ live hot tap completed on an active pipeline

✓ Tonisco hot tapping valve installed for the new branch connection

✓ Tapping equipment positioned and aligned before cutting

✓ Controlled live cutting completed while the line remained in service

✓ System conditions monitored to maintain pressure integrity

✓ Coupon captured and recovered during the tapping operation

✓ Final connection verified before completion

IMG_3399.jpg

Project Impact

Completing the connection live allowed the existing pipeline to remain operational while the new branch point was installed. This avoided the disruption associated with a conventional shutdown and drain-down and reduced the additional work required for system refill, restart, and recommissioning.

The project demonstrates WellFab’s ability to integrate Tonisco hot tapping valve technology into a controlled field execution plan for live pipeline modifications.

Need Hot Tapping Support for a Live System?

Explore WellFab’s hot tapping capabilities, equipment, operating ranges, and live connection services.

bottom of page